St George’s Hospital

Health

Powering the new electrical infrastructure at St George’s Hospital.

Project info

Acting as principal contractor, we recently completed the replacement of the primary high voltage and low voltage electrical infrastructure within the Lanesborough building at St George’s Hospital, Tooting, South London.

What We Did

We were engaged to manage, procure and deliver the new electrical infrastructure in conjunction with our supply chain partners.

The works comprised of the installation and design which included the following: 2 no high voltage switchboards, 3 no 1.5Mva standby generators, 4 no 11Kv 1500Kva oil filled transformers,1 no low voltage generator switchboard, 4 no ATS switchboards.

Featured Projects

Bringing buildings to life.

From commercial, residential, laboratories, hotels, and one-off bespokes, each of our projects make optimal use of space, with minimal environmental impact.

OUR SERVICES

We offer a complete range of mechanical, electrical and public health services, always staying up to date with the latest industry thinking, and using the most innovative technologies.